| 01 |
Northern Railway |
Patel Nagar (Delhi) |
Fabricated Composite Plate Girder 450 Mtr Long |
Construction of FOB for pedestrian with additional provision for two wheelers at L-Xing 4 At PTNR on LJPT-PTNR section in the section of ADEN/Spl/NDLS under Sr. DEN-III. |
2020 |
| 02 |
BC Infra Projects Pvt Ltd |
Kharkhoda, Haryana |
Fabricated Pre Engineering Building 14 Mtr I 120 Mtr Long x 42.5 Mtr wide |
Pre Engineering Building |
2020 |
| 03 |
NHAI |
Uttarakhand |
Fabricated Composite Plate Girder 30x3 Mtr +40x1 Mtr, 4 Span. |
Construction of ROB at Nepali Farm, Haridwar Dehradun Junction |
2020 |
| 04 |
NHAI |
Dasna, Ghaziabad, Uttar Pradesh |
Box type Drains along the bridge and Diversion of 800 Dia Trunk Sewerage Line |
Laying of Sewerage Pipe and drainage system |
2019 |
| 05 |
NHAI |
Dasna, Ghaziabad, Uttar Pradesh |
8 Lane Interchange with 32 PSC Girder |
Construction of Interchange at Km 52 |
2018 |
| 06 |
NHAI |
Dasna, Ghaziabad, Uttar Pradesh |
PSC Girder with Pile Foundation |
Construction of Minor Bridge at Km 49 |
2018 |
| 07 |
Northern Railway, India |
Jaroda Nara, Muzaffarnagar |
Structure on Pile Foundation and PSC Girder |
Construction of Bridge No 166 consisting of Span 3x18.5 mtr |
2018 |
| 08 |
Northern Railway, India |
Muzaffarnagar |
Open Web Steel Girder with Channel Sleeper |
Construction of Super Structure of Railway Bridge No 154 |
2018 |
| 09 |
Tata Value Homes |
|
Driven Stone Column Pile |
Construction of Residential Project "Destination 150". |
2017 |
| 10 |
Ministry of Foreign Affairs |
New Delhi |
800 Dia Concrete Piles with 1.5mtr Rock Socketing using Down the Hole Hammer method |
Royal Danish Embassy |
2016 |
| 11 |
New Delhi World Class Railway Station |
Sonipat |
12 PreCast Box Launching after excavation of 1100cum within a block of 6 Hours |
Limited Height Subway by Cut and Cover Method
Location: LC 28 & 31
|
2016 |
| 12 |
S.S Construction, Chandigarh |
Sector 6, Dwarka, New Delhi |
800 Dia Touch Piles with 9 meterTemporary Casing in Backfilled Soil |
Continuous piling for Soil Protection |
2015 |
| 13 |
Hindustan Construction |
Pitampura New Delhi |
Soldier Piling with Wooden lagging and Strut Waller system |
Soldier Piling work for DMRC CC-30 Project |
2014 |
| 14 |
Hindustan Construction |
Pitampura New Delhi |
Continuous Bored Piling with fiber reinforcement |
Piling work for Tunnel Boring for DMRC CC-30 Project |
2013 |
| 15 |
Northern Central Railway, India |
LC No.553 km between Mathura Palwal route |
Structure on Pile Foundation and
MS Plate Composite Girder |
Construction of Railway Over Bridge |
2013 |
| 16 |
Northern Central Railway, India |
LC No.55 near Muzaffarnagar |
Open Foundation and MS Plate Composite Girder |
Construction of Railway Over Bridge |
2013 |
| 17 |
Shapoorji Pallonji & Co. Ltd |
Sector 62,Gurgoan |
Diaphragm Wall |
Construction of Diaphragm Wall |
2013 |
| 18 |
North Central Railway, India |
Agra Fort –Idgah Stations |
Structure on Pile Foundation and PSC Girder |
Construction of ROB No 157 at Km 83/5-6 |
2012 |
| 19 |
North Central Railway, India |
Mathura-Virindavan Road |
Structure on Pile Foundation and PSC Girder |
Construction of Road Over Bridge |
2010 |